Vestas wins first V136-4.2 MW order in South Korea

GO ECO GREEN21

Vestas wins first V136-4.2 MW order in South Korea

Vestas wins first V136-4.2 MW order in South Korea
News release from Vestas Asia Pacific
Singapore, 27 December 2019
GO ECO GREEN21. This week, Vestas has secured its first V136-4.2 MW order in South Korea for the Cheongsong Myeonbong Mt Wind Power project with EPC contractor Kumho Industrial Co., Ltd.
The 42 MW order consists of ten V136-4.2 MW wind turbines at a hub height of 112m as well as a 20-year Active Output Management 4000 (AOM 4000) service agreement, designed to maximise uptime and ensure optimised performance of the project.
To optimise operation in the site’s specific wind conditions, the turbines will feature Vestas’ High Wind Operation (HWO), an intelligent control option that allows the turbines to continue operating beyond standard cut-out wind speeds. The result is improved output stability, energy production, and reliability, helping the project to deliver the…

View original post 300 more words

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s