Vestas secures 86 MW EPC deal with Nexif Energy to extend Lincoln Gap Wind Farm in Australia

ENERGIA RENOVABLE Y CAMBIO CLIMATICO

GO ECO GREEN21

GO ECO GREEN21. Vestas has signed an 86 MW contract with Nexif Energy for the second stage of the Lincoln Gap Wind Farm in South Australia. The EPC agreement will include the engineering, procurement and construction of 24 of Vestas’ V136-3.45 MW turbines delivered in 3.6 MW Power Optimised Mode. This will add to the customer’s existing fleet of 126 MW of Senvion turbines which are being serviced by Vestas.

By replacing Senvion as the EPC contractor, the project is on course to successfully meet Nexif Energy’s long-term sustainable goals for South Australia. A report carried by Go Eco Green21 states that, upon completion, Vestas will commence a 20-year Active Output Management 5000 (AOM 5000) service agreement for the new turbines. This is designed to maximise energy production for the lifetime of the project. With an energy-based availability guarantee which covers both the turbines and balance of plant assets, Vestas…

View original post 372 more words

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s