Turkey with more wind energy, Nordex Acciona brings world-class technology

GO ECO GREEN21

ENERGIA LIMPIA XXI/GO ECO GREEN21. End of September, the Nordex Group received a 24 MW order from its regular customer Sancak Enerji in Turkey. For the “Baglar-3” wind farm, the Nordex Group will supply five N133/4800 strong-wind turbines. The order also includes a Premium Service contract over a ten-year term.

The “Baglar-3” wind farm will be built in the Konya province, near its provincial capital of the same name, about 200 kilometres south of Ankara. Due to the very humid and cold winters at the site, the Nordex Group will supply the turbines in the Cold Climate Version (CCV). The N133/4800 will be installed on tubular steel towers with hub heights of 110 meters. With a mean annual wind speed of 8 meters per second, the strong-wind turbines are ideal for the location. A report carried by Go Eco Green21 states that the installation phase will begin in summer of…

View original post 176 more words

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s